Isabella Dam

Hear this article

UPDATED ANTICIPATED AREAS TO BE FLOODED IN THE UNLIKELY EVENT THE ISABELLA DAM FAILS

In early 2008, the United States Army Corps of Engineers completed the initial preparation of an updated map which shows the areas around metropolitan Bakersfield which would likely be flooded in the chinese conterfit viagra pills unlikely case that the Dam should fail at Lake Isabella. As part of the maps provided the County, they have also included maps which show the anticipated depth and velocity of buy viagra fedex water and the anticipated time when the flows could reach the online discount cialis Bakersfield area if a failure of the dam occurred.

More experienced users may also view the information in the County's interactive GIS. The County's interactive GIS also contains the maps which were prepared in the early 1970s by the U. S. Army Corps of Engineers that shows the areas of Kern County which could be affected should the dam fail on Lake Isabella, Jacobsen Lake in the Cummings Valley area and Berrenda Mesa Lake north of Lost Hills.

ISABELLA DAM FAILURE EVACUATION PLAN

The Isabella Dam Failure Evacuation Plan provides the basic framework for response to an actual or potential failure of the Lake Isabella Dam. The plan supplements the Kern County/Operational Area and City of Bakersfield Emergency Operations Plans (EOPs) and will be implemented in conjunction with those EOPs.

Extensive research concerning hurricane-related evacuations indicates that for the buying viagra in uk shops evacuation of communities to be effective, residents must know which areas are at risk and must be persuaded to leave; the evacuation must commence prior to arrival of the threat; and transportation resources must be sufficient to move evacuees to safe areas.

When determining if people will evacuate, three factors are key:

  1. Actual and perceived vulnerability of their location,
  2. Whether or not they believe they have been told to evacuate by local officials, and
  3. The severity of the threat.


Aggressively communicating the evacuation recommendation tends to produce the desired action, although dissemination of the warning via the media is not usually sufficient. The best way to alert the public is for officials to go door-to-door. The second best method is to drive through neighborhoods announcing the evacuation recommendation over vehicle-mounted public address systems.

This plan calls for emergency notification information to be widely disseminated via all available means, including:

  • Activation of local emergency telephone notification systems (commonly referred to as "reverse 911" systems),
  • Local media,
  • Local specific needs agencies and daily cialis pill groups,
  • Neighborhood drive-through by local law enforcement, and
  • Outdoor sirens where available.

This Evacuation Plan also calls for implementing an aggressive and ongoing public information program during the preparedness phase; advising the cialis prescription america public of any potential problems with the dam and possible need to evacuate; and the issuance of a precautionary evacuation recommendation well in advance of the need to issue a general evacuation recommendation. This staged approach will facilitate the early evacuation and sheltering of most specific needs populations and many from the general population, thereby reducing the number of evacuees and the volume of traffic to be accommodated during the general evacuation recommendation.

Responding to a failure of Lake Isabella Dam and the resulting flood, including evacuation of more than one-quarter million people and viagra cost ireland sheltering 50,000 to 70,000 of the evacuees, will be a complex and resource-intensive operation, which will require close coordination among multiple local jurisdictions, disciplines and private and nonprofit agencies, as well as state and federal resources. If the same extraordinary level of coordination and cooperation demonstrated by all of these stakeholders during development of this plan is present when it must be implemented, the likelihood of a positive outcome will be assured.

pdf_icon_small Isabella Dam Failure Plan
pdf_icon_small Evacuation Zones & Routes
pdf_icon_small Time To 1 Foot Inundation
pdf_icon_small Maximum Velocity
pdf_icon_small Peak Inundation Depth

These maps are based on a worst-case senario of Main Dam failure with the Lake full.

PLEASE NOTE IN USING THE MAPS AND INFORMATION: The Corps of Engineers has loaned the County of Kern the above documents "For Official Use Only" and consented to us making the cost viagra cialis maps available to the public for their viewing and pharmacy on line viagra self planning. This information is not an evacuation map and should be used for general guidance and planning purposes. Actual areas which may flood and time may vary from the areas depicted on the map.

This information is compiled from multiple sources that do not always exactly align with each other. Discrepancies are most predominant in the mountain areas. Use of the map is provided for general guidance and preplanning only. Using these maps, especially in the mountain areas, the user should account for any misalignment with the terrain and aerial photos.